Power Grid Transient Abnormally Compensation Scheme
Overview
Due to eternal interference(such as lightning),the power grid has a transient power outage,witch will cause some important equipment to shut down and affect the stable operation of the system.The AC anti-shake system is connected to the power grid in parallel,using super capacitors to store electric energy,and when the anti-shaking system detects the phenomenon of shaking in the higher-level power grid,it is immediately put into operation and discharged externally to maintain the stability of the back-level power grid system.When the shaking is over,the anti-shaking system stops discharging externally and turns to over-capacity charging.After the over-capacity full charge,it is transferred to standby operation to prepare the next system for anti-shaking.
Key Feature